Monday, June 1, 2015

Pavement Removal and Paving to Begin this Week.

Work Completed Last Week:

Concrete Curb & Gutter and Sidewalk Replacement (Schroeder & Schroeder):
·         Osage Drive – Indian Ridge Drive to West Cul-de-Sac.
·         Mohawk Lane – Indian Ridge Drive to Saranac Lane.
·         Vantage Lane – Pfingsten Road to East End, including Cul-de-Sacs (Both sides for roadway)
·         Greenbriar Drive – Lotus Lane to Warren Road (Both sides of roadway).
·         Estate Lane – 100% Completed

Storm Sewer Improvements (DiVinci)
·         Mohawk Lane – Indian Ridge Drive to Saranac Lane.
·         Osage Drive – Indian Ridge Drive to West Cul-de-Sac.
·         Vantage Lane – Pfingsten Road to East End, including Cul-de-Sacs.
·         Greenbriar Drive – Lotus Lane to Warren Road.

Residents along Vantage Lane now have access to their driveways, as of Saturday, May 30th.

Work Anticipated Next Week:

Concrete Curb & Gutter Replacement (Schroeder & Schroeder):
·         Complete concrete sidewalk and curb & gutter on Mohawk Lane, Vantage Lane, and Greenbriar Lane.
·         Driveway replacements on Greenbriar Drive 

Storm Sewer Improvements (DiVinci)
·         No work anticipated

 Asphalt Pavement Removal and Paving (JA Johnson Paving)
·         Mohawk Lane – Indian Ridge Drive to Saranac Lane, including Mohawk CDS
·         Osage Drive – Indian Ridge Drive to West Cul-de-Sac
·         Brookdale Lane – Landwehr Road to West End
·         Vantage Lane – Pfingsten Road to East End, including Cul-de-Sacs
·         Greenbriar Drive – Lotus Lane to Warren Road
·         Minor Asphalt Patching at various locations throughout the Village.  

Parking will not be allowed on the street from 7am to 5pm during paving operations.

When pavement is coated with fresh oil and sand, please drive slowly to avoid it getting stuck to your cars.

Access may be limited for a short time as the asphalt is being placed in front of your driveways

Thank you for all your patience and understanding during the construction.